Skip to product information
1 of 1

Bosch

Radionix D122L Dual Battery Harness with Long Leads

Radionix D122L Dual Battery Harness with Long Leads

MPN: D122L

Regular price $36.98
Regular price Sale price $36.98
Sale Special Order
Shipping calculated at checkout.

Special Order

Low stock: 4 left

Quantity
View full details
Use the D122L Dual battery harness with long leads when batteries are in a separate enclosure from the control panel. It protects the installer and battery when connecting two batteries, in parallel, to compatible control panels. The D122L eliminates the hazards of batteries connected in parallel by utilizing a thermal circuit breaker to govern the circuit. It breaks the electrical circuit of the second battery when the thermal rating is exceeded.

Main Features

  • Used for batteries in parallel in a separate enclosure
  • Slide-on connectors
  • Built-in circuit breaker protection